Most of the work has been done where possible...and unfortunately we have to wait for carpentry to be done before we can finish up with electrical and plumbing works, and some other stuff. Parquet and toilet bowls will be done tomorrow, and then we can decide on paint colours for the house too. =)
Electrical work done on the ceiling for master bedroom downlights. Yes, 4 halogen lights are WAY TOO BRIGHT, but we're installing a dimmer system and using the lowest wattage possible for the bulbs. We figured 2 lights were too little and 3 was such an odd layout.
A fountain of electrical work in the kitchen.
Nice common toilet tiles are all up.
View of the corridor from the Kitchen.